Divača Substation
Project
Piva Hydropower Plant
Facility name
Piva Hydropower Plant
Investor / Client
EPCG
Location
Mratinje, Montenegro
Time period
1961-79/2018-22
Facility size / Capacity
Rated power: 342 MW; installed power: 3 x 114 MW/ 3 x 120 MVA
The Piva storage HPP, with its impressive 220-metre-high concrete arch dam, belongs among the HPP’s with tallest dams in Europe.
General
Although the original concept was partially modified during the design process, the essence of the original idea remained unchanged: finding the optimal location for a frontal storage in the Piva valley in order to balance the energy potential of the downstream power plants on the Drina River.
The concrete arch dam, 270 m long and 220 m high, with its imposing position in the Piva River canyon, created a storage reservoir of 824,000,000 m³. With a drop of 200 metres and 3 vertical Francis turbines with a total installed capacity of 342 MW located in an underground machine room, this hydropower giant generates 860 GWh of electricity per year from a renewable and sustainable source. This achievement not only makes it a key player in the energy landscape, but also an example of the sustainable use of natural resources for electricity generation.
IBE services
As part of the design of the building (1961-1979), IBE provided the following services for the client:
The Piva River Basic Energy Project,
- Investment documentation,
- Conceptual design of civil, electrical and mechanical engineering for:
- arch concrete dam,
- underground machine room,
- inlet and outlet tunnels,
- The construction part of the project for all underground structures and the diversion of the River Piva during construction. The electrical-mechanical part of the project was developed jointly with the other designers.
In 2016, as part of the upgrade and modernisation of the facility, we carried out:
- BIM modeling of the underground engine room and access tunnels,
- an electrical and mechanical equipment upgrade project with associated civil works,
- a complete refurbishment of the control room.