IBE d.d.
Project

Project

Pekel Railway Tunnel

Facility name

Pekel Railway Tunnel

Investor / Client

Republic of Slovenia, Ministry of Infrastructure

Location

Maribor, Slovenia

Time period

2017-2023

Facility size / capacity

Length: 1530 m

The construction of the new Pekel railway tunnel, as part of the upgrade of the Maribor - Štenilj railway line, includes comprehensive improvements, including greater safety, speed and efficiency of rail transport.

Project basis and goals

As part of the upgrade of the Maribor - Šentilj railway line, a new Pekel tunnel has been built. The construction of a new tunnel on the railway line, along with other interventions on the line, made possible:

  • modernization and renovation of the line in accordance with European standards,
  • increase in line category from C3 to D4 (22.5 t/axle),
  • increase in the level of traffic safety,
  • increase in the capacity of the line from 68 to 84 trains/day,
  • increase in the transport capacity of the line from 3.9 to 8.1 million net tons/year,
  • reduction of travel time,
  • speed increase to up to 120 km/h,
  • more efficient traffic management,
  • noise reduction,
  • optimal flow of train traffic.


The Pekel railway tunnel is a two-track, single-tube railway tunnel and is the second modern railway tunnel in Slovenia, after the Karavanke tunnel.


Project basis and goals

IBE services

Using BIM technology IBE produced the project for obtaining a building permit and the construction implementation documentation of the electro-mechanical equipment of the tunnel in accordance with the requirements of EU Commission Regulation no. 1303/2014 on the technical specification for interoperability in relation to safety in railway tunnels of the railway system of the European Union to the extent of:

  • Tunnel electricity supply for general power supply and tunnel safety systems, including a transformer station and a diesel-electric generator set for alternate power supply.
  • General and safety lighting in the tunnel, the escape tunnel, all niches, the drive center and on the rescue platforms, sockets for connecting the equipment of the rescue services.
  • Control and monitoring system and safety systems of the tunnel.
  • Rescue tunnel ventilation with an overpressure and air-lock system to prevent smoke and heat entering the rescue tunnel for safe evacuation, ventilation, heating and air conditioning systems for all technical rooms.
  • Fire water system with water tank and hydrants.
IBE services

Photography authors: Direkcija RS za infrastrukturo and IBE d.d.

Photography source: web page Krajšamo razdalje (krajsamorazdalje.si)

Similar reference projects:

Ajdovščina Compressor Station

Ajdovščina Compressor Station

Transmission and Distribution Gas Pipelines

Transmission and Distribution Gas Pipelines

Kidričevo Compressor Station

Kidričevo Compressor Station

Back to list
Back to top